What Factors Affect Residential Construction Estimates For New Homes?
WriterShelf™ is a unique multiple pen name blogging and forum platform. Protect relationships and your privacy. Take your writing in new directions. ** Join WriterShelf**
WriterShelf™ is an open writing platform. The views, information and opinions in this article are those of the author.
Article info
Total: 998 words
Like
or Dislike
About the Author
My name is James David.
More to explore
It is possible for two houses to have the same square footage and varying prices. The answer is that much more than square feet goes into residential construction estimates. The number fluctuates with land, design, and finishes, local rules, and market prices.
NAHB Construction Cost Survey shows the size of the effect. Construction was 64.4% of the average new home price, with an average construction cost of $428,215. Even a small change in one factor can add thousands of dollars.
Residential estimating services help by pricing each factor before building starts. This article lists the main factors and explains how each one changes the estimate. It also gives a way to check that none were missed.
How Are Residential Construction Estimates Built From Stages?
Start with the base. NAHB's survey splits the average construction cost into eight stages.
Stage
Average Cost
Share of Construction Cost
Site work
$32,719
7.6%
Foundations
$44,748
10.5%
Framing
$70,982
16.6%
Exterior finishes
$57,510
13.4%
Major systems rough-ins
$82,319
19.2%
Interior finishes
$103,391
24.1%
Final steps
$27,710
6.5%
Other
$8,835
2.1%
NAHB notes that the survey has 41 usable responses and does not show the average home in any one place or year. If you see in the table which stages are big, then use that, not the price to price a house.
Over 43% of the cost is comprised of interior finishes and major systems (plumbing, electrical, heating and cooling). These are also the stages where owner choices change the number the most.
How Does The Location Change The Number?
Location has an impact on land, labor costs, delivery of materials, and local charges. Where wages are high, the distance to deliver houses, or building regulations are strict, the cost of new house construction increases.
Local rules are also important. The costs of permits, impact fees, and energy codes vary from city to city and from state to state. The estimate of one town may not be accurate in another. The prices quoted for residential construction estimates should be for the area where the house will be constructed.
How Do Finishes Change The Estimate?
Interior finishes are the largest stage in the NAHB table, at 24.1%. The cost of cabinets, counters, flooring, tile, lights, and plumbing fixtures can be quite variable. The cost of two kitchens in a room of the same size will vary significantly.
This is why estimates are frequently done using allowances. An allowance is the price of an item that the owner has not selected. If the owner chooses something that is costlier than originally planned, it will cost more in the end. Each allowance should be displayed on the estimate. Home construction budget planning allows project owners to set realistic allowances for:
Kitchen
Cabinets
Fixtures
Flooring
Other finishes
How Do Site Conditions Affect Cost?
The lot decides how much site work and foundation work the house needs. Site work and foundations together were about 18% of the construction cost in the NAHB table.
Several conditions can raise that share:
Slopes that need grading or retaining walls
Rock or poor soil
Trees that must be removed
Long distances to water, sewer, and power
Wet ground that needs drainage
A realistic example shows the effect. Two families planned 2,200-square-foot homes. One lot was flat, and the other had a steep slope. If site work and foundation costs on the sloped lot were double the NAHB averages, the extra cost would be about $77,000. The house design was the same. Only the lot was different.
How Do Material And Labor Markets Change The Estimate?
Material prices and labor rates change over time. The price of something may not be the same today as it was last year. It's also difficult to find skilled workers, which can increase the cost of labor or slow down the timeline.
Time also matters. A longer schedule means more supervision, more equipment rental, and more months of loan interest. An estimate should show the date of its prices. Also, it should state the validity period of these prices. The numbers may need to be updated if the start date is pushed back by a few months.
What Costs Sit Outside The Building Itself?
New house building costs are more than the construction price. The remaining 11.0% of the price is for the builder's profit, with the overhead and general expenses in the middle at 5.7%, the market at 0.8%, and the financing at 1.5%. Other components of the price are the finished lot, at 13.7%, and the sales commission at 2.8%.
Whether it's real estate or a business, an owner who constructs on owned land will not pay for a lot. The owner will be paying for the overheads and profits in the contract if this is the case. Be aware of the items included in the estimate and those payable separately.
What Does An Owner Do If An Estimate?
These six questions help an owner judge any residential project cost estimation:
How many stories, what is their shape, and size?
What is the depth of finish and allowances?
What were the site and foundation conditions assumed?
When and where are the prices from?
How much contingency is included?
What expenses are excluded (land, permits, landscaping, etc.)?
These items are identified in plain language in SMA Estimating LLC's estimates. Each stage is presented on a new line, allowing the owner to see the impact of a design change.
Conclusion
The residential construction estimates are subject to the location, design, finishes, site conditions, and prevailing material and labor expenses. Being aware of these aspects at an early stage will help the homeowner establish a realistic budget, as well as compare costs and prevent any unexpected costs during the construction. It is also much easier to see what can be saved and where it could be done, without affecting the quality, when looking at each cost prior to the contract signing. What part of your home plan might be the biggest contributor to the expenses of your home?